Contract Name Description of Works Value of Works Contract Identification Number Client Commencement Date Completion Date
Opening of Access Road at Kigwabya Hydro Power Dam (Sub-Contract) Design & Build of Acess Road at Kigwabya Hydro Electricity Dam. Road Length: 750m, Longitudinal Slope: 12%, Road Width: 6m, Wearing Course: Gravel Wearing Course Ushs. 531,000,000 PA/WORKS/021 PA Technical Services Limited 6th February 2023 23rd March 2023
Framework Contract for Supply & Installation of Irrigation Equipment for Medium & Small-Scale Irrigation Schemes in Eastern Region – WFPRC EAST Supply of Irrigation Equipment Ushs. 5,000,000,000 MoWE/SUPLS/2021-2022/00510 Ministry of Water & Environment, Water for Production Regional Centre – East 6th December 2022 6th June 2024
Construction of Orwamuge Towns Water Supply System Construction of 1No. Pump Station, 50m Transmission Mains, 100m3 Steel Tank, 14.4km Distribution Mains, 1No. Water Office, 1No. Chlorine Dosing House, 1No. Guard House, 1No. Ecosan Toilet, Solar Energy Package (54 Solar Panels, Pump and Inverter) Ushs. 1,528,670,199 MWE/WSDF-N/WRKS/18-19/00001 Ministry of Water

and Environment

(MWE), Karamoja Small Towns & Rural Growth Centres Water Supply & Sanitation Project

14th February 2019 14th February 2020
Construction of Kabasekende Water Supply System Phase 2 Construction of 2No. borehole pump and generator houses, Supply & installation of 2No. Solar systems to power 2 boreholes, Laying of approximately 15km of distribution network and service pipes, Construction of a water office premises, Construction of chemical house and guard houses, Construction of 20No. public standposts Ushs. 911,378,391 KIBA524/WRKS/FY2018-2019/00053 Kabaale District Local Government 17th January 2019 17th June 2019
Mechanised Maintenance Of Selected Unpaved National Roads Under Framework Contracts For 3 Years (363km) – Lot 19: Moroto Station Grading, re-gravelling works, drainage works and lining, culvert installation and end structures construction. Ushs. 14,745,730,760 UNRA/WORKS/2016-17/00018/19 Uganda National Roads Authority (UNRA)  

June/2018

 

June/2021

Construction of

Kikyusa Piped

Water Supply System

Construction of 3No. Borehole Pumping Stations, each consisting of a Pump house,  Attendant/guard house, eco-san toilet, Fencing and landscaping works, Generator House (For specified station), Water Sump (For specified station), supply and Laying of Transmission and Distribution Pipelines, extension of 3-Phase Grid Power to the pumping stations, Construction of a Chemical House/Water Treatment House, Construction of a 300m3 Reservoir Tank on a 12m high steel tower, Construction of 400No. Yard Taps Connections in 10No. Public Taps, Construction of a Water Office Block, supply and Installation of Electrical and Mechanical Equipment and Fittings including Chemical dozers, submersible pumps, surface pumps, transformer, control units etc, supply of Tools and Equipment, construction of 2No. Water Borne Toilets Ushs. 5,580,357,354 MWE/WSDF-C/WRKS/16-17/00044 Ministry of Water

and Environment

(MWE), Water and

Sanitation

Development

Facility – Central (WSDF – C)

15th September 2017 20th December 2017
Framework Contract for Supply & Installation of Irrigation Equipment for Small Scale Irrigation Schemes in Eastern & Karamoja Regions Supply of Irrigation Equipment Ushs. 5,000,000,000 MWE/WSDF-E/SUPLS/18-19/00018 Ministry of Water & Environment, Water for Production Regional Centre – East 14th August 2019 14th February 2021
Framework

Contract for

Supply of Construction Materials for a Period of One Year

Supply of Construction Materials Ushs. 5,000,000,000 MWE/WSDF-SW/SUPLSFC/17-18/00009/2 Ministry of Water

and Environment

(MWE), Water and

Sanitation

Development

Facility – South

West Branch (WSDF– SWB)

28th August 2018 27th August 2019
Framework

Contract for

Supply of Pipes and Fittings for a Period of One Year

Supply of Water Pipes and Fittings Ushs. 5,000,000,000 MWE/WSDF-SW/SUPLSFC/17-18/00009/8 Ministry of Water

and Environment

(MWE), Water and

Sanitation

Development

Facility – South

West Branch (WSDF– SWB)

28th August 2018 27th August 2019
Framework

Contract for

Supply of Pipes and Fittings

Supply of Water Pipes and Fittings Ushs. 5,000,000,000 MWE/WSDF-SW/SUPLSFC/16-17/6000 Ministry of Water

and Environment

(MWE), Water and

Sanitation

Development

Facility – South

West Branch (WSDF– SWB)

15th February 2017 15th February 2018
Construction of Amudat Town Water Supply System Phase I Construction of 1No. Pump Houses, Construction of 2km of Transmission Mains, Construction of 1no. Chlorine Dosing House, Construction of 1no. Reservoir Tank of capacity 150cum, Construction of 8km of Distribution Mains, Construction of 1no. Ecosan Toilet at the pump station, Construction of 1no. Guard house at the pump station, Supply and Installation of Electro-mechanical works comprising of mainly 1no. Submersible Pump, 1no. in-line chlorine dossier, 30KVA Diesel generator Ushs. 1,933,516,064 MWE/WSDF-E/WRKS/16-17/00004 Ministry of Water and Environment (MWE), Water and Sanitation Development Facility – East (WSDF – E) 25th May 2017 25th February 2018
Construction of Climate Resilient Institutional and Public Sanitation Facilities Construction of 42No. 6 Stance Enviro-loo Toilets, 10No. 6 Stance Cesspit Toilets, 16No. 6 Stance Ventilated Improved Pit (VIP) Latrines Ushs. 3,869,451, MWE/WRKS/16-17/00981020/1 Ministry of Water and Environment (MWE), Directorate of Water Development 26th April 2017 16th November 2018
Construction of Irundu Town Water Supply System Construction of No.1 Office, No.1 Public Water Borne Toilet, No.1 Guard House, No.1 Chemical Dosing House, No.1 Borehole Pump Station, 100 Meter transmission mains, No.1 138 mᶟ Steel Tank on 20m tower, 5.1 Km distribution mains and No.1 eco – san Toilet. Ushs. 1,726,133,873 MWE/WSDF-E/WRKS/13-14/00043 Ministry of Water and Environment (MWE), Water and Sanitation Development Facility – East (WSDF – E) 4th July 2014 17th December 2015
Rehabilitation of 25km of Community Access Roads in Kyankwanzi District Site Clearance, Heavy Grading, Spot Gravelling, Drainage Works Ushs. 555,050,760 (VAT Inclusive) MOWT/Wrks/IP/15-16/008 Ministry of Works and Transport (MOWT) 2nd October 2016 13th June 2016
Construction of Mini Water Supply Systems in Kayunga District 4No. Borehole installation and site works, Construction of 4 No. Pump Houses, Electro-Mechanical Works, Construction of 4No. 24m3 Elevated Steel Reservoir, Demolition & Reconstruction of Foundation for the Existing Tank and Re-election of the existing tank including restoration of all pipe work, Laying of pumping mains and distribution mains in Ntooke, Laying of service pipelines and installation of consumer connections, Installation of 2No. Hand Pumps into Boreholes Ushs. 2,347,660,678 MWE/WSDF-C/WRKS/14-15/00006 Ministry of Water and Environment (MWE), Water and Sanitation Development Facility – Central (WSDF – C) 14th August 2015 15th March 2016
Periodic Maintenance of 44 Selected National Roads (28) Lots – Lot: 21 Obongi – Kulikulinga Road (45Km) Grading, re-gravelling works, drainage works and lining, culvert installation and end structures construction. Ushs. 2,462,317,800 (VAT Inclusive) UNRA/WORKS/2013-14/00028/01/21 Uganda National Roads Authority (UNRA)  

April/ 2015

 

April/ 2016

Expansion of Ocapa Town Water Supply System Construction of 7.5km Transmission Mains, 37.0km of Distribution Mains, 135m3 and 50m3 Steel Tanks, 1No. Chlorine Dosing House, 1No. Water Office, 1No. Eco-san Toilet, 1No. Guard House Toilets, Electro-Mechanical Works. Ushs. 2,445,445,396 MWE/WSDF-E/WRKS/14-15/00042 Ministry of Water and Environment (MWE), Water and Sanitation Development Facility – East (WSDF – E)  

April/ 2015

 

Aug/ 2017

Term Maintenance of 24 Selected National Roads – Phase IV-11 Lots: Lot: 4 Kagadi – Kibaale (40.2Km) Grading, re-gravelling works, drainage works and lining, culvert installation and end structures construction Ushs. 2,622,631,440 UNRA/WORKS/2013-14/00019/01/04 Uganda National Roads Authority (UNRA)  

October/ 2014

 

October/ 2017

Construction of Buyamba RGC Piped Water Supply and Sanitation Scheme – Rakai District: Construction of an Aerator, Rapid Mixing Device, Flocculator, Sedimentation Tank, Rapid Gravity Filter, Chlorine Contact Tank, Pumping Station, Generator House, Backwash System, 200m3 Concrete Tank, 500m Raw Water Transmission Mains, 2.6km Clear Water Transmission Mains, 30.8km Distribution Mains, Sludge Drying Beds, Chemical House, Water Office, Public Waterborne Toilet, Guard House, Eco-san Toilet Ushs. 2,396,357,492 MWE/WSDF-SWB/WRKS/15-16/00006 Ministry of Water and Environment (MWE), Water and Sanitation Development Facility – South West Branch (WSDF – SWB) 19th August 2016 19th September 2017
Term Maintenance of 14 Selected National Roads – Phase VII (14 Lots) – Lot 05: Moroto – Lokitanyala Road Grading, re-gravelling works, drainage works and lining, culvert installation and end structures construction Ushs. 4,729,883,444 UNRA/WRKS/2014-15/00017/05 Uganda National Roads Authority (UNRA) 2nd May 2016 2nd May 2020