WORKS PROFILE
Contract Name | Description of Works | Value of Works | Contract Identification Number | Client | Commencement Date | Completion Date |
Opening of Access Road at Kigwabya Hydro Power Dam (Sub-Contract) | Design & Build of Acess Road at Kigwabya Hydro Electricity Dam. Road Length: 750m, Longitudinal Slope: 12%, Road Width: 6m, Wearing Course: Gravel Wearing Course | Ushs. 531,000,000 | PA/WORKS/021 | PA Technical Services Limited | 6th February 2023 | 23rd March 2023 |
Framework Contract for Supply & Installation of Irrigation Equipment for Medium & Small-Scale Irrigation Schemes in Eastern Region – WFPRC EAST | Supply of Irrigation Equipment | Ushs. 5,000,000,000 | MoWE/SUPLS/2021-2022/00510 | Ministry of Water & Environment, Water for Production Regional Centre – East | 6th December 2022 | 6th June 2024 |
Construction of Orwamuge Towns Water Supply System | Construction of 1No. Pump Station, 50m Transmission Mains, 100m3 Steel Tank, 14.4km Distribution Mains, 1No. Water Office, 1No. Chlorine Dosing House, 1No. Guard House, 1No. Ecosan Toilet, Solar Energy Package (54 Solar Panels, Pump and Inverter) | Ushs. 1,528,670,199 | MWE/WSDF-N/WRKS/18-19/00001 | Ministry of Water
and Environment (MWE), Karamoja Small Towns & Rural Growth Centres Water Supply & Sanitation Project |
14th February 2019 | 14th February 2020 |
Construction of Kabasekende Water Supply System Phase 2 | Construction of 2No. borehole pump and generator houses, Supply & installation of 2No. Solar systems to power 2 boreholes, Laying of approximately 15km of distribution network and service pipes, Construction of a water office premises, Construction of chemical house and guard houses, Construction of 20No. public standposts | Ushs. 911,378,391 | KIBA524/WRKS/FY2018-2019/00053 | Kabaale District Local Government | 17th January 2019 | 17th June 2019 |
Mechanised Maintenance Of Selected Unpaved National Roads Under Framework Contracts For 3 Years (363km) – Lot 19: Moroto Station | Grading, re-gravelling works, drainage works and lining, culvert installation and end structures construction. | Ushs. 14,745,730,760 | UNRA/WORKS/2016-17/00018/19 | Uganda National Roads Authority (UNRA) |
June/2018 |
June/2021 |
Construction of
Kikyusa Piped Water Supply System |
Construction of 3No. Borehole Pumping Stations, each consisting of a Pump house, Attendant/guard house, eco-san toilet, Fencing and landscaping works, Generator House (For specified station), Water Sump (For specified station), supply and Laying of Transmission and Distribution Pipelines, extension of 3-Phase Grid Power to the pumping stations, Construction of a Chemical House/Water Treatment House, Construction of a 300m3 Reservoir Tank on a 12m high steel tower, Construction of 400No. Yard Taps Connections in 10No. Public Taps, Construction of a Water Office Block, supply and Installation of Electrical and Mechanical Equipment and Fittings including Chemical dozers, submersible pumps, surface pumps, transformer, control units etc, supply of Tools and Equipment, construction of 2No. Water Borne Toilets | Ushs. 5,580,357,354 | MWE/WSDF-C/WRKS/16-17/00044 | Ministry of Water
and Environment (MWE), Water and Sanitation Development Facility – Central (WSDF – C) |
15th September 2017 | 20th December 2017 |
Framework Contract for Supply & Installation of Irrigation Equipment for Small Scale Irrigation Schemes in Eastern & Karamoja Regions | Supply of Irrigation Equipment | Ushs. 5,000,000,000 | MWE/WSDF-E/SUPLS/18-19/00018 | Ministry of Water & Environment, Water for Production Regional Centre – East | 14th August 2019 | 14th February 2021 |
Framework
Contract for Supply of Construction Materials for a Period of One Year |
Supply of Construction Materials | Ushs. 5,000,000,000 | MWE/WSDF-SW/SUPLSFC/17-18/00009/2 | Ministry of Water
and Environment (MWE), Water and Sanitation Development Facility – South West Branch (WSDF– SWB) |
28th August 2018 | 27th August 2019 |
Framework
Contract for Supply of Pipes and Fittings for a Period of One Year |
Supply of Water Pipes and Fittings | Ushs. 5,000,000,000 | MWE/WSDF-SW/SUPLSFC/17-18/00009/8 | Ministry of Water
and Environment (MWE), Water and Sanitation Development Facility – South West Branch (WSDF– SWB) |
28th August 2018 | 27th August 2019 |
Framework
Contract for Supply of Pipes and Fittings |
Supply of Water Pipes and Fittings | Ushs. 5,000,000,000 | MWE/WSDF-SW/SUPLSFC/16-17/6000 | Ministry of Water
and Environment (MWE), Water and Sanitation Development Facility – South West Branch (WSDF– SWB) |
15th February 2017 | 15th February 2018 |
Construction of Amudat Town Water Supply System Phase I | Construction of 1No. Pump Houses, Construction of 2km of Transmission Mains, Construction of 1no. Chlorine Dosing House, Construction of 1no. Reservoir Tank of capacity 150cum, Construction of 8km of Distribution Mains, Construction of 1no. Ecosan Toilet at the pump station, Construction of 1no. Guard house at the pump station, Supply and Installation of Electro-mechanical works comprising of mainly 1no. Submersible Pump, 1no. in-line chlorine dossier, 30KVA Diesel generator | Ushs. 1,933,516,064 | MWE/WSDF-E/WRKS/16-17/00004 | Ministry of Water and Environment (MWE), Water and Sanitation Development Facility – East (WSDF – E) | 25th May 2017 | 25th February 2018 |
Construction of Climate Resilient Institutional and Public Sanitation Facilities | Construction of 42No. 6 Stance Enviro-loo Toilets, 10No. 6 Stance Cesspit Toilets, 16No. 6 Stance Ventilated Improved Pit (VIP) Latrines | Ushs. 3,869,451, | MWE/WRKS/16-17/00981020/1 | Ministry of Water and Environment (MWE), Directorate of Water Development | 26th April 2017 | 16th November 2018 |
Construction of Irundu Town Water Supply System | Construction of No.1 Office, No.1 Public Water Borne Toilet, No.1 Guard House, No.1 Chemical Dosing House, No.1 Borehole Pump Station, 100 Meter transmission mains, No.1 138 mᶟ Steel Tank on 20m tower, 5.1 Km distribution mains and No.1 eco – san Toilet. | Ushs. 1,726,133,873 | MWE/WSDF-E/WRKS/13-14/00043 | Ministry of Water and Environment (MWE), Water and Sanitation Development Facility – East (WSDF – E) | 4th July 2014 | 17th December 2015 |
Rehabilitation of 25km of Community Access Roads in Kyankwanzi District | Site Clearance, Heavy Grading, Spot Gravelling, Drainage Works | Ushs. 555,050,760 (VAT Inclusive) | MOWT/Wrks/IP/15-16/008 | Ministry of Works and Transport (MOWT) | 2nd October 2016 | 13th June 2016 |
Construction of Mini Water Supply Systems in Kayunga District | 4No. Borehole installation and site works, Construction of 4 No. Pump Houses, Electro-Mechanical Works, Construction of 4No. 24m3 Elevated Steel Reservoir, Demolition & Reconstruction of Foundation for the Existing Tank and Re-election of the existing tank including restoration of all pipe work, Laying of pumping mains and distribution mains in Ntooke, Laying of service pipelines and installation of consumer connections, Installation of 2No. Hand Pumps into Boreholes | Ushs. 2,347,660,678 | MWE/WSDF-C/WRKS/14-15/00006 | Ministry of Water and Environment (MWE), Water and Sanitation Development Facility – Central (WSDF – C) | 14th August 2015 | 15th March 2016 |
Periodic Maintenance of 44 Selected National Roads (28) Lots – Lot: 21 Obongi – Kulikulinga Road (45Km) | Grading, re-gravelling works, drainage works and lining, culvert installation and end structures construction. | Ushs. 2,462,317,800 (VAT Inclusive) | UNRA/WORKS/2013-14/00028/01/21 | Uganda National Roads Authority (UNRA) |
April/ 2015 |
April/ 2016 |
Expansion of Ocapa Town Water Supply System | Construction of 7.5km Transmission Mains, 37.0km of Distribution Mains, 135m3 and 50m3 Steel Tanks, 1No. Chlorine Dosing House, 1No. Water Office, 1No. Eco-san Toilet, 1No. Guard House Toilets, Electro-Mechanical Works. | Ushs. 2,445,445,396 | MWE/WSDF-E/WRKS/14-15/00042 | Ministry of Water and Environment (MWE), Water and Sanitation Development Facility – East (WSDF – E) |
April/ 2015 |
Aug/ 2017 |
Term Maintenance of 24 Selected National Roads – Phase IV-11 Lots: Lot: 4 Kagadi – Kibaale (40.2Km) | Grading, re-gravelling works, drainage works and lining, culvert installation and end structures construction | Ushs. 2,622,631,440 | UNRA/WORKS/2013-14/00019/01/04 | Uganda National Roads Authority (UNRA) |
October/ 2014 |
October/ 2017 |
Construction of Buyamba RGC Piped Water Supply and Sanitation Scheme – Rakai District: | Construction of an Aerator, Rapid Mixing Device, Flocculator, Sedimentation Tank, Rapid Gravity Filter, Chlorine Contact Tank, Pumping Station, Generator House, Backwash System, 200m3 Concrete Tank, 500m Raw Water Transmission Mains, 2.6km Clear Water Transmission Mains, 30.8km Distribution Mains, Sludge Drying Beds, Chemical House, Water Office, Public Waterborne Toilet, Guard House, Eco-san Toilet | Ushs. 2,396,357,492 | MWE/WSDF-SWB/WRKS/15-16/00006 | Ministry of Water and Environment (MWE), Water and Sanitation Development Facility – South West Branch (WSDF – SWB) | 19th August 2016 | 19th September 2017 |
Term Maintenance of 14 Selected National Roads – Phase VII (14 Lots) – Lot 05: Moroto – Lokitanyala Road | Grading, re-gravelling works, drainage works and lining, culvert installation and end structures construction | Ushs. 4,729,883,444 | UNRA/WRKS/2014-15/00017/05 | Uganda National Roads Authority (UNRA) | 2nd May 2016 | 2nd May 2020 |